We just wrapped up this classic primary bathroom remodel. We didn’t move plumbing or electrical, so we were in and out within 3 weeks. The trick is, having all selections picked out and ordered BEFORE we start! This is what our process looked like. I’ve linked to ALL products HERE.
Before
The Process
We started with demoing the bathroom and adding some structure to the floors with the Ditra Membrane. We kept their existing vanities and bathtub. Otherwise, everything was redone! I had countertops templated as soon as the old ones were removed. Then we started tiling…. for days! Lots of tile :o) We did herringbone on the walls and tub surround, pebbles on the shower floor, and large hex tiles for the bathroom floor.
Once tile was finished, we installed countertops and plumbing fixtures and all finishes! The paint color is Accessible Beige. Then we installed shower glass! It came out beautifully! I absolutely love it.
Finishes
Light Fixture | Wallpaper in WC | Wallpaper in bedroom | Faucets | Fireplace Tile | Floor Hex | Wall Tile | Shower Head | Tub Faucet| Dip Died Stool
The Transformation
And that’s a wrap! Another beautiful renovation in the books. I can’t wait to share the next one!
XOXO,
Emily
Leave a Reply